Create a defined foreign-material removal point before cutting and extraction equipment.
Incoming material
Root stream containing possible dense foreign material
Outgoing material
Root stream after designed stone separation; separate rejects
Working arrangement
A density-separation or purpose-designed separation section directs dense material to a collection point while the root stream continues. Its operating range must be established with the actual feed.
Stone separation module
Root stream containing possible dense foreign material → Root stream after designed stone separation; separate rejects
Configuration and equipment drawing follow the confirmed process scope.
Specification
Define these parameters
Stone size and density distribution
Root buoyancy and size range
Water flow and reject removal arrangement
Inspection and isolation access
Request a challenge trial using representative roots and identified foreign-material hazards.
Integration
Connect the interfaces
Locate where incoming material can be controlled and removed rejects cannot re-enter the line. Coordinate upstream washing and downstream inspection.
Cleaning and access
Provide safe access to the stone trap, wear surfaces and drainage. Verify that sludge cannot mask a full collection zone.
No separator should be described as removing all foreign bodies. Verification and complementary inspection remain necessary.
Connected equipment
Root inspection conveyor
Washed, separated roots → Accepted roots and an identifiable reject stream
Configuration and equipment drawing follow the confirmed process scope.
Clear product and equipment requirements make the next conversation useful.
What does the stone separation module do?
Create a defined foreign-material removal point before cutting and extraction equipment.
How should this equipment be selected?
Request a challenge trial using representative roots and identified foreign-material hazards.
What information should I include in the enquiry?
Stone size and density distribution; Root buoyancy and size range; Water flow and reject removal arrangement; Inspection and isolation access. Include the upstream and downstream product interfaces.